Pages

Wednesday, October 26, 2011

Weekly Kitchen Update

Last week was all about making decisions.  We have been trying to come to a decision regarding the cabinets.  We were finally able to get several estimates.  The estimates ranged from $4600-$8000 for solid plywood cabinets.  We did lots of soul searching and decided we really did not want to spend that much money on cabinets.  We were not in love with any of the cabinets that we looked at.  So we decided to stick with what seems natural to us, trying to use as much of our existing cabinets as we can.  Mitch will build any new cabinets that we need. 

The one good thing about getting all of the estimates for the cabinets were these cool plans that we received. These really helped us visualize how the kitchen will (hopefully) look one day. 

DSC_1820
DSC_1822

Look at all the cabinet space we are going to gain by the fridge. We have decided that we are going to do butcherblock for the countertops on this section and probably granite for the section by the sink.
DSC_1824 

Mitch did manage to find a little bit of time on Sunday to start building out the recession for the fridge.

DSC_1792 

We moved the fridge to make sure it would fit in the opening.  It fit!! 

DSC_1799

It is all ready for drywall.  We have a contractor coming this week to do some of the electrical work and drywall this area.   

DSC_1807 

While Mitch was working, I put a coat of primer on the riser.  It made me feel useful. : )

DSC_1806

Baseball season ended last night so that will free up some time for us.  No telling what we could accomplish if we actually had a full weekend to work on the kitchen. 

1 comment:

Unknown said...

I think there is nothing cooler than looking at plans. I think I should have been an architect. The cabinets around the fridge are going to be awesome!!

LinkWithin

Related Posts with Thumbnails