Monday, February 27, 2012

Kitchen Update-Week 1 Progress

Ok, that title may be a little misleading considering we have been working on our kitchen since September.  But here is our progress after a week with our contractor.

He was able to fix all of the wires that were hung in the soffit.  He reinforced the opening and started drywalling.

DSC_3275 

DSC_3278 

Then he finished up the drywall on both sides and the ceiling.

DSC_3280 

He built our cabinets, which I primed this weekend.  This is a glimpse of what we are living in right now.

DSC_3295 

We decided on Wednesday night that we were going to put new flooring in the kitchen.  We didn't have enough extra flooring to patch the open areas.  We were also concerned that they would not be able to be refinished.  They were pretty scratched up.  Then when you factor in the sanding and the multiple coats of finish, it just made sense to put down a floating laminate floor.  We really wanted real hardwood, but that was going to entail pulling up all of the subfloor.  So with the additional expense and work it was going to take, we decided on laminate.

This photo shows the self leveler that Mitch put on the floor.

DSC_3306 

Here's a random photo of the ceiling after 3 coats of mud.

DSC_3314 

Someone left a comment inquiring about what we did with our existing cabinets.  The bottom cabinets were not salvageable, but the upper cabinets found a home in our garage.

DSC_3316 

DSC_3318 

Here's an in progress shot of the floor installation.

DSC_3323 

It took Mitch and I about 5 hours to do the floor. Once we found our groove it went pretty fast.

DSC_3326 


DSC_3328 

DSC_3331

Our contractor is installing the cabinets today.  Then he is going to start making all the doors for the cabinets. The countertops are being templated tomorrow.  They will be installed next Monday.  I will be back tomorrow with photos of our cabinets and tell you about our countertop choice.